三年高清片大全_丝袜黄色网站免费看_秋霞午夜在线观看_亚洲熟女少妇一区_国产日韩三级在线播放_成人午夜视频黄_四虎影院永久网站_黄色毛片免费观看网站_国产偷出轨精品免费视频_三级日本亚洲高清

天域苍穹,我欲封天 耳根 小说零
{"img":"","passBy":"0","picBd":"0","size":"1","bdSize":"1","cwidth":22,"cheight":61,"picBdRadio":"0","borderType":"solid","jump":"0","definedUrl":"","isPicBd":"0","effectBdLine":"solid","image":"http://oss.xinghuo86.cn/1107517773971567/1123780172709888.png","picWidth":22,"picHeight":61,"inpColor":"","color":"#000000","type":0,"effectBdColor":"#000000","hasEdit":true}

Professional solution provider for heating and cooling

Professional research and development, production, and sales of refrigeration and air conditioning equipment

{"img":"","passBy":"0","picBd":"0","size":"1","bdSize":"1","cwidth":55,"cheight":52,"picBdRadio":"0","borderType":"solid","jump":"0","definedUrl":"","isPicBd":"0","effectBdLine":"solid","image":"http://oss.xinghuo86.cn/1107517773971567/1123780172709891.png","picWidth":55,"picHeight":52,"inpColor":"","color":"#000000","type":0,"effectBdColor":"#000000","hasEdit":true}

0755-89619830    

Blowdown method for refrigeration system
Date: 2023-05-23 18:16:36Pageviews: 85

After the installation of refrigeration equipment, it is inevitable that there will still be welding slag, iron filings, oxides, sand and other residues inside the system. In order to avoid damage to the valve and unit, and to avoid clogging of the filter and pipeline, it is necessary to clean the unit before operation. Pressure gas is usually used to blow out the pipeline and system for sewage discharge, with a blowing pressure of 0.6MPa. The blowing work can use compressors, air compressors, nitrogen bottles, etc. as gas sources. For the Freon system, it is best to use nitrogen gas for blowing out, because Freon has high requirements for the system's water content, and using compressed air will inevitably bring in water. Nitrogen gas is non corrosive, moisture free, non flammable, non explosive, inexpensive, and easy to operate and use.

The sewage discharge work can be carried out in different sections and floors. The sewage outlet should be located at the lowest point of each section. When discharging, all valves in the system that come into contact with the external atmosphere should be closed, and all other valves should be fully opened. At the sewage outlet, a wooden plug can be used to block the opening of the pipe section that needs to be blown out (for safety reasons, the wooden plug is fastened with iron wire or wrapped in a hemp bag to prevent it from flying out and injuring people). When the pressure reaches 0.6MPa, knock off the wooden plug to quickly discharge the gas, in order to discharge the dirt and water in the pipeline. Repeat this process one to three times until all dirt and moisture are removed. The sewage discharge work should be carried out continuously and sequentially until all are removed.


The inspection method for sewage discharge is as follows: When discharging, place a piece of soaked white gauze or a wet white oil paint plate at a distance of 150-200mm from the sewage outlet. It is qualified if there are no obvious stains after the gas is blown. During the sewage discharge process, the valve should be opened and closed as little as possible to prevent dirt from damaging the sealing line of the valve. After the system discharge is completed, the valve core of the filter and valve should be disassembled and cleaned.